Sorry to interrupt this fascinating tech discussion with an operations question, but: If I choose to use no stored power during a lap, and the track configuration and charging rate affords say 1mJ per lap of input, can I then continue to load my storage system and save that power up to the regulated storage limit, say 4mJ, for use during an opportune moment later in the race?
Are there any suggestions that I must use what power is gathered in one lap during that lap? If the total power gathered during one lap is less than the stored power allowed, I should be able to bank it for strategic reasons. Maybe this has been discussed, and if so, please forgive my ignorance.
I'm not too in tune with the engineering possibilities, I am just listening to this discussion, but I do have an interest in the strategic value.
Please don't tell me the regs won't allow what I have suggested, because at this point there are no regs.
Thanks
Or, have I totally misunderstood the subject?