mwillems wrote: ↑01 Sep 2023, 00:09
LionsHeart wrote: ↑31 Aug 2023, 23:23
SmallSoldier wrote: ↑31 Aug 2023, 22:58
Development does not include the production of parts… The point is that the team is already fully focused in regards to 2024… The manufacturing team may be finishing parts, but that’s because at this stage of the 2024 there aren’t that many new parts to build for that car.
Well, I don't argue with that. I just simply noted that for myself I do not share these concepts. For me, development is a process from start to finish (until the final receipt of the product in physical format).
When you hear Stella discussing these things, development is everything in the process up to sign off, which is to say it has been signed off/released to be manufactured. Manufacturing will continue for various reasons after development. The new floor and Sidepods are not ready for instance, new parts will be required to fix damage or wear and tear.
The manufacturing team will be slowing down after the final update up until the new prototype design for the 24 car is ready to be produced for initial tunnel testing later in the year. Well, probably in a couple of months.
That's right. Everything is exactly like that. I am not arguing about this. It's just that earlier in my childhood, when I could invent something, like a hand planer made of wood, the process of designing and modeling took a couple of minutes in my head, then I started production.
If in the process I realized that I was going in the wrong direction, then I tried to make adjustments locally and then continued to work. If the workpiece was already damaged, then he began to do everything again. The design process in this format runs parallel to the production process. This is a normal creative process. Therefore, in my old habit, I do not separate the modeling-development process from the production process.
From the moment an idea comes in, to the completion of all the work and the final product or result, as you wish, for me it's all a development process. In large structures, factories, where many engineers, mechanics, technologists work, everything is different. All processes and stages are described. And there it takes a lot of time from the beginning of the idea to the final one, when the production is completed.
I understand that if the team wants to bring an updated bottom and other body elements to the track in September, then the development process went on in June-July until the summer break. Also, before the summer break, the production process could begin, I’m not sure about this for sure, but some of the elements could be made in time.